CURRENT BIDDING PROJECTS

 

ELKHART: Wastewater Treatment facility improvements - tues. april 24, 2018 (2:00PM)

Construct improvements including all labor, materials and equipment necessary for excavation, backfill and sitework; demolition work; reinforced concrete; masonry building work including plumbing, heating, ventilating, doors, and associated work; painting; aeration equipment; ultraviolet disinfection equipment; pumps; electrical work including conduit, cables, wiring, motor controls, starters, switches, fixtures and controls; piping and appurtenances; and miscellaneous associated work, including cleanup.

 

WALTHILL, NE: walthill wellness trail project - phase ii - mon. april 30, 2018 (1:30PM)

FOR WALTHILL PLANS AND SPECS PLEASE CONTACT OUR SERGEANT BLUFF OFFICE

 712-943-5055 or mwaite@v-k.net

 

altoona: 2018 sanitary sewer rehabilitation - tues. may 1, 2018 (2:00PM)

Construct approximately 5,700 linear feet of cured-in place pipe, 8-inch through 10-inch diameter sanitary sewer, reinstate and rehabilitate sewer service connections, cleanup and associated work.

 

waukee: little walnut creek trunk sewer extension - phase 3/indi run trunk sewer - WED. may 2, 2018 (2:00PM)

Construct Little Walnut Creek Trunk Sewer Extension – Phase 3/Indi Run Trunk Sewer including all labor, materials and equipment necessary for approximately 4,965 linear feet of 8-inch through 24-inch diameter sanitary sewer in open cut, manholes, excavation and backfill, surface restoration and miscellaneous associated work, including cleanup.

 

perry water works: willis ave water main replacement and diagonal road water main extension - thurs. may 3, 2018 (2:00PM)

Construct Willis Avenue Water Main Replacement and Diagonal Road Water Main Extension including all labor, materials and equipment necessary for approximately 2,727 linear feet of 10‑inch pvc water main directional bored in place, 1,272 linear feet of 8‑inch water main open cut in place, fire hydrants, valves, surface restoration and miscellaneous associated work, including cleanup.

 

KNOXVILLE WATER WORKS: 132nd place water main and raw water main replacement - phase 2 - fri. may 4, 2018 (2:00PM)

Construct 132nd Place Water Main & Raw Water Main Replacement Project – Phase 2 including all labor, equipment and materials necessary for approximately 5,200 linear feet of 10‑inch water main, 5,100 linear feet of 12-inch raw water main, 10-inch gate valves, 7,000 square yards of 6-inch thick granular surfacing, air release/vacuum valve manholes, water main fittings, field drain lines, 400 linear feet of 3/4‑inch water service in open cut and miscellaneous associated work, including cleanup.

 

TO REQUEST PLANS AND SPECS PLEASE CONTACT US

800-241-8000

mveenstra@v-k.net