CURRENT BIDDING PROJECTS

norwalk: delaware street sanitary sewer extension phase 2 and 3 - thurs. February 28, 2019 (2:00 PM)

Construct Delaware Street Sanitary Sewer Extension Phase 2 and 3 project including all labor, materials and equipment necessary to construct approximately 2,700 Linear Feet of 18‑inch sanitary sewer in open cut, sanitary services in open cut, manholes,service connection, field tile, excavation and backfill, surface restoration, erosion control, testing, mobilization, traffic control and miscellaneous work, including cleanup.

scranton: wastewater treatment facility improvements - wed. march 6, 2019 (2:00 PM)

Furnish all labor, equipment, and materials necessary for excavation, backfill and sitework, submerged attached growth reactor cells, reinforced concrete structures, aeration equipment, manholes, lagoon piping, valves, electrical work including conduit, cables, wiring, motor controls, starts, switches, fixtures, and controls, sanitary sewers, manholes and miscellaneous associated work, including cleanup. 

urbandale sanitary sewer district: trunk sewer extension - 2017 (rebid) - thurs. march 7, 2019 (2:00 PM)

Construct Trunk Sewer Extension – 2017 (Rebid) including all materials, labor and equipment necessary for approximately 2,307 linear feet of sanitary sewer trenched, 10” to 15” diameter, 355 linear feet of 15-inch sanitary sewer trenchless in casing pipe, manholes, driveways, erosion control, seeding, sodding and other miscellaneous associated work, including cleanup.  The project is located north and south of Meredith Drive in approximately the 17400 block. 

monroe: wastewater treatment facility improvements - thurs. march 7, 2019 (2:00 PM)

Construct improvements including all labor, materials and equipment necessary for excavation, backfill and sitework; demolition work; reinforced concrete; painting; aeration equipment; ultraviolet disinfection equipment; pumps; electrical work including conduit, cables, wiring, motor controls, starters, switches, fixtures and controls; piping and appurtenances; and miscellaneous associated work, including cleanup.

grinnell: central business district 2019 maintenance project - thurs. march 7, 2019 (2:00 PM)

Repair various locations as indicated in the plans including but not limited to pavers, street and walks, curb and gutters, light replacement and miscellaneous associated work, including traffic control and cleanup.

carroll: wastewater treatment plant disinfection improvements - tues. march 19, 2019 (2:00 PM)

Construct Wastewater Treatment Plant Disinfection Improvements including all labor, equipment, and materials necessary for excavation, backfill and sitework, sheeting, shoring and bracing, reinforced concrete, precast concrete, piping and appurtenances, sluice gates, parshall flume, building work including installation of UV equipment, manholes, piping and appurtenances, electrical improvements, conduits, cables, power wiring, plumbing, heating and ventilating, and miscellaneous associated work, including cleanup.

TO REQUEST PLANS AND SPECS PLEASE CONTACT US

800-241-8000

kdriscoll@v-k.net