CURRENT BIDDING PROJECTS

 

woodward: wastewater treatment plant improvements - thurs. july 19 (2:00 PM)

Construct improvements including all labor, materials and equipment necessary for excavation, backfill and site work, submerged attached growth reactor cells, reinforced concrete structures, aeration equipment, manholes, lagoon piping, valves: electrical work including conduit, cables, wiring, motor controls, starts, switches, fixtures, and controls, sanitary sewers, manholes and miscellaneous associated work, including cleanup.

 

waukee: original sanitary sewer collection system rehabilitation - phase 4 - wed. august 1 (2:00 PM)

Construct approximately 7,300 linear feet of cured‑in‑place pipe, 6‑inch through 12‑inch diameter sanitary sewer, reinstate and grout sewer services, CIPP patch, cleanup and miscellaneous associated work.

 

BONDURANT: Parkside water main extension rebid - wed. august 1 (10:00 aM)

Construct Parkside Water Main Extension including all labor, materials and equipment necessary for approximately 4,530 linear feet of 12‑inch water main installed in open cut, 300 linear feet of 12‑inch water main directional drilled in place, connections to existing system, hydrants, valves, excavation, backfill, PCC trail removal and replacement, traffic control, surface restoration and miscellaneous associated work, including cleanup.  The project is located along and east of Highway 65 in Bondurant, Iowa. 

 