CURRENT BIDDING PROJECTS 

dallas center: hatton avenue storm sewer extension - wed. june 5, 2019 (11:00 AM)

Construct approximately 414 linear feet of storm sewer, 15” - 18” diameter, structures, manholes, intakes, grading, seeding, surface restoration, and associated work including cleanup with the improvements located on Hatton Avenue from Walnut Street to Maple Street.

dallas center: 2019 street improvements - wed. june 5, 2019 (2:00 PM)

Construct 2019 Street Improvements, including all labor, materials and equipment necessary to overlay 9 blocks, or approximately 3,200 linear feet of pavement with hot mix asphalt.  Existing streets to be overlaid are approximately 18 feet wide.  Upon completion, streets are to be 22 feet wide.  Project includes the widening of the existing roadway base.  The average thickness of the overlay is 2.5 inches.  The project also includes miscellaneous associated work and cleanup.

perry water works: 2019 water main replacement - thurs. june 6, 2019 (2:00 PM)

Construct the 2019 Water Main Replacement including all labor, materials and equipment necessary for approximately 526 linear feet of 10‑inch pvc water main, 1,349 linear feet of 8-inch water main and 2,936 linear feet of 6-inch water main directional bored in place; fire hydrants; valves, water service pipe and curb stops; surface restoration and miscellaneous associated work, including cleanup.